News thumbnail
Nation / Sat, 01 Aug 2026 Odisha TV

Hirakud dam opens 22 gates, massive water release puts downstream areas on alert

The Hirakud Dam opened two more gates, taking the total number of open gates to 22, after inflow into the reservoir crossed 4.15 lakh cusecs. The Water Resources Department increased the discharge as more water continued to enter the reservoir from the upper catchment, officials said on Saturday. AdvertismentThere is an inflow of 4,15,017 cusecs of water, while 3,89,000 cusecs is being released downstream. Water Resources Chief Engineer Dillip Raut said the additional gates were opened to regulate the reservoir level and ensure smooth management of the rising inflow. Also Read: Odisha opens 10 more gates of Hirakud dam amid rising reservoir levels after heavy rainOfficials said the number of gates in operation may change depending on the inflow into the reservoir.

The Hirakud Dam opened two more gates, taking the total number of open gates to 22, after inflow into the reservoir crossed 4.15 lakh cusecs. The Water Resources Department increased the discharge as more water continued to enter the reservoir from the upper catchment, officials said on Saturday.

Advertisment

There is an inflow of 4,15,017 cusecs of water, while 3,89,000 cusecs is being released downstream. Water Resources Chief Engineer Dillip Raut said the additional gates were opened to regulate the reservoir level and ensure smooth management of the rising inflow. The officials are monitoring the water level round the clock and reviewing the reservoir’s status at regular intervals.

Flow At Khairmal Likely To Rise

The increased discharge from Hirakud is expected to push the flow at Khairmal to around 7.5 lakh cusecs after the released water reaches the downstream stretch. Officials are keeping a close watch on the river system and assessing its impact on vulnerable areas along the Mahanadi basin.

Advertisment

The rise in inflow follows continuous rainfall in the upstream catchment over the past few days. Engineers are regulating the outflow based on the volume of water entering the reservoir and reviewing the gate operation accordingly to maintain a balanced discharge.

Administration Keeps Watch Downstream

With several districts still dealing with the flood situation in Odisha, the administration has stepped up monitoring along the downstream stretches of the Mahanadi. The people living near the river have been advised to remain alert and avoid venturing into the water.

Also Read: Odisha opens 10 more gates of Hirakud dam amid rising reservoir levels after heavy rain

Officials said the number of gates in operation may change depending on the inflow into the reservoir. Moreover, surveillance is continuing to ensure timely action if the situation changes.

Read In HINDI:

पढ़ें: 500 साल रेत में दबा था ये रहस्यमयी जहाज़, मिला सोना-चांदी का खजाना… लेकिन 200 लोग कहां गए?

पढ़ें: Odisha: 100+ दुर्लभ कमल उगाकर लाखों कमा रहे प्रकाश चंद्र नायक, ₹15 लाख सालाना बिक्री का लक्ष्य

यह भी पढ़ें: Love Wins Over Flood! ओडिशा में बाढ़ के बीच अनोखी शादी: जाजपुर का दूल्हा 4 km नाव से पहुंचा दुल्हन के घर

पढ़ें: Himalayan Diamond: इंसान से ऊंचा बढ़ने वाला दुर्लभ ‘केन्जो’ फूल, 7 से 15 साल में आता है एक बार खिलने का मौका

© All Rights Reserved.